Smarter Access, Safer Delivery: The Apsley Easter Blockade

During the Easter blockade at Apsley station, Enable Infrastructure and Enable Design delivered critical Access for All (AfA) foundation upgrades for Network Rail under a collaborative one‑team approach with Taziker. By engineering a bespoke temporary access solution with Cordek Ltd, the team completed deep piling and complex civils works in a constrained station environment with zero On Track Plant (OTP) dependency. The innovative approach reduced risk, improved safety and enabled the site to be handed back ahead of schedule.

Find out more

Capability Spotlight: Delivering Complex Geotechnical Solutions at Dollis Hill

The Dollis Hill Retaining Wall project stands as a definitive case study in Enable Infrastructure’s ability to execute complex geotechnical…

Find out more

Dollis Hill Replacement Retaining Wall

Delivered for London Underground, this project involved replacing a failing retaining wall adjacent to the live Metropolitan and Jubilee lines. Enable Infrastructure utilised a King Post Wall solution to stabilise the cutting slope, overcoming hazardous ground conditions and severe logistical constraints to deliver the scheme safely and on programme.

Find out more

Soho Depot – Phase II

Enable Infrastructure completed Phase 2 of the Soho EMU Depot upgrade for West Midlands Trains, following successful delivery of Phase 1. Works included demolition of eight concrete walkways, installation of GRP replacements, deep drainage systems, CET plantroom, and modernised lighting. Despite complex site constraints, Enable delivered safely, on time, and under budget—saving £1.3 million through value engineering.

Find out more

EARTHING & BONDING – CVL E&B

Enable Infrastructure successfully delivered Earthing & Bonding works (Package 12) across the ABD and THT Lines as part of the Core Valley Lines electrification project. Working in close collaboration with Transport for Wales and Amey, the project included bonding at 12 stations—4 major and 8 minor—and civils enhancements to support future-proof installations. Notably, significant works were completed at the new Porth transport hub, ensuring compliance with BS7671 and Electricity at Work Regulations.

Find out more

MTR Rail for London Framework

Enable delivered infrastructure upgrades for TfL across London Underground, Overground, DLR, and Crossrail. Projects included structural safety works, embankment stabilisation, and improved public access. Collaborating with MTR, Enable overcame complex design and operational challenges to deliver safe, efficient, and sustainable engineering solutions..

Find out more

READING INDEPENDENT FEEDER

Enable Infrastructure delivered a new high-voltage electricity supply to the Reading Auto Transformer Feeder Site (ATFS), enhancing power resilience across the Wales and Western network. The 17km HV cable route from Holly Cross ATFS—powered by Bramley National Grid—forms part of the 25kV Rationalised Autotransformer System (RATS), supporting electric train operations between London, Cardiff, and Newbury. The project included complex civil and electrical works, environmental mitigation, and stakeholder coordination to future-proof the network.

Find out more

Empowering Progress at Hollycross ATFS – Stage 2

Enable Power Systems, in collaboration with Network Rail Testing and WJP Services, successfully completed stage 2 commissioning of the Hollycross auto transformer feeder site, energising critical 25kV infrastructure and confirming compliance with safety and performance standards.

Find out more

VMX SWITCHGEAR REPLACEMENT FOR DLR – 11kV AC ECLIPSE SWITCHBOARD

Enable Infrastructure replaced aging 11kV switchgear at the Custom House Substation for the Docklands Light Railway. Key project elements included upgrading to modern equipment, integrating new systems, and executing complex commissioning over multiple shifts. Challenges involved logistics and stakeholder coordination, which Enable mitigated through careful planning and collaboration. The completed project enhanced reliability for DLR customers.

Find out more

TRACK ANCILLARIES AND REACTIVE WORKS

Network Rail contracted Enable Infrastructure to maintain, assess, and upgrade track ancillary assets across the Southeast region. Key deliverables include repairing drainage, longitudinal timbers, level crossings, and constructing road-rail access points. Challenges included last-minute access cancellations and emergency mobilisations. Enable mitigated these by coordinating with stakeholders, maintaining flexibility, and drawing on specialised expertise.

Find out more

SOHO DEPOT PROJECT

Enable Infrastructure upgraded the Soho Depot in Birmingham for West Midlands Trains to maintain new Class 730 trains. The project involved civil, electrical, mechanical, and signaling upgrades to accommodate the new fleet. As program integrator, Enable managed stakeholders and oversaw the project’s diverse scope. Enable’s solutions included detailed stakeholder consultations, phased work packages, and collaborative 3D modeling to minimise disruptions and meet timelines.

Find out more

CORE VALLEY LINE WORKS

The project aims to transform rail service in Cardiff and the surrounding Valleys, upgrading infrastructure like overhead lines, power, fencing, and signage. Key challenges included coordinating disciplines, design delays, and environmental constraints. Enable addressed these through collaboration, flexible resource allocation, and proactive stakeholder management. Deliverables include cable management, platform tactile installation, tree trimming, and boundary fencing to enhance safety and reliability.

Find out more