Building

Capability Spotlight: Delivering Complex Geotechnical Solutions at Dollis Hill

The Dollis Hill Retaining Wall project stands as a definitive case study in Enable Infrastructure’s ability to execute complex geotechnical…

Find out more

MTR Rail for London Framework

Enable delivered infrastructure upgrades for TfL across London Underground, Overground, DLR, and Crossrail. Projects included structural safety works, embankment stabilisation, and improved public access. Collaborating with MTR, Enable overcame complex design and operational challenges to deliver safe, efficient, and sustainable engineering solutions..

Find out more

COVENTRY STATION RENOVATION PROGRAMME​

Enable Infrastructure completed the Coventry Station Renovation Programme, including a new substation, lifts, and car park, to prepare the station for the 2022 Commonwealth Games. The project involved extensive collaboration to address challenges like unexploded WWII ordnance, delivering critical infrastructure upgrades that benefited the local community and enabled the successful hosting of major sporting events.

Find out more

IMPROVING SECURITY AND ACCESS AT COMPANIES HOUSE

Enable Infrastructure completed the Gatehouse Project to enhance security and access at the Companies House facility in Cardiff. Working through the Crown Commercial Services Framework, they installed robust barriers, security fencing, turnstiles, and vehicle gates to control entry and exit. The project also included new foundations, surfacing, CCTV, lighting, and signage to improve traffic flow and security. Enable overcame challenges like working in a high-security, pedestrianized area by meticulous planning and collaboration.

Find out more

ICP CONNECTION UNDER-TRACK INSTALLATION AT WESTON-SUPER-MARE

Enable Infrastructure installed two under-track crossings (UTX) for Western Power Distribution in Weston-super-Mare, connecting substations at Warne Road and Bourneville Road. The project involved excavation, reinforced concrete works, and the installation of a 610mm sleeve auger using a guided auger-boring technique. Key deliverables included two UTX installations, reinforced concrete works, duct installations, resurfacing, and the reinstatement of a play park and football pitch.

Find out more

MILTON KEYNES UNIVERSITY HOSPITAL – CRITICAL POWER SUPPLIES​

 Enable Infrastructure upgraded Milton Keynes University Hospital’s critical power systems, replacing transformers and generators to ensure uninterrupted service. The project included installing a 1400 kVA standby generator and temporary backup power while upgrading the substation and cabling. The project also featured voluntary initiatives, leaving a legacy in the hospital’s cancer ward garden. Key deliverables included transformer replacements, substation upgrades, and new backup systems.

Find out more

GIDEA PARK DRIVERS’ AND CLEANERS’ ACCOMMODATION

This project involved building modular buildings for MTR Elizabeth Line and Bombardier staff, along with a new access road, parking, and utilities. It also included enhancements such as parking facilities, a bicycle shelter, and EV charging points. All infrastructure—drainage, paving, lighting, and CCTV—was completed on time and within budget. Deliverables included vegetation removal, new permeable paving, drainage, access gates, CCTV, lighting, and additional facilities like smoking and cycle shelters.

Find out more

NEW SUBSTATION IN KEY TOWN CENTRE DEVELOPMENT

Enable Infrastructure were ….

Find out more

URGENT RECTIFIER TRANSFORMER REPLACEMENT FOR DLR

Enable Infrastructure completed an urgent rectifier transformer replacement for Docklands Light Railway (DLR) at Royal Mint Street, ensuring stable power for the network’s busiest line. Following the failure of two 2167kVA rectifier transformers, Enable swiftly designed, installed, and commissioned replacements within an accelerated seven-day timeframe, condensing an original three-week schedule. This complex project involved road and cycle route closures coordinated with Tower Hamlets Council and TfL, securing public safety around the worksite.

Find out more

LYMINSTER BYPASS BRIDGES​

Enable Infrastructure successfully delivered two concrete bridges for the A284 Lyminster Bypass in West Sussex, spanning a road and rail line as part of a 1.8km bypass project. Working within pre-scheduled rail possessions alongside Network Rail’s ASPRO team, Enable managed to uphold the construction timeline without impacting railway operations. This included detailed Any Line Open (ALO) planning and a ‘High Street’ working setup that allowed excavation, abutments, and bearing pad work without rail disruption.

Find out more

HITHER GREEN BLOCKADE

Enable Infrastructure’s Hither Green Blockade project delivered essential upgrades at nine stations on the Sidcup, Grove Park, and Bromley North lines, enhancing passenger benefits from Network Rail’s new signalling system. Despite the challenges of Easter 2020 lockdowns, Enable completed extensive works across all stations, including resurfacing, drainage repairs, canopy maintenance, and safety improvements like tactile and coper installations.

Find out more

PLATFORM EXTENSIONS – KETTERING STATION

Enable Infrastructure’s platform extensions at Kettering Station enhance local connectivity and boost capacity for 240m trains, supporting regional growth and efficiency on the London to Corby route. The project involved over 55 local workers, complying with heritage standards and reflecting our commitment to sustainable, community-focused infrastructure.

Find out more