Rail

Enable Infrastructure working to improve Network Rail Track Access Points

BCM Construction has been working with Network Rail on multiple projects to renew or improve Road Rail Access Points (RRAPS), Safe Walking Routes and Track Worker Safety Sites.

Find out more

Enable Infrastructure Concluding on Tactile Installation at 100 Platforms Across 43 Stations in the Sussex, Kent and London Area.

BCM have completed the majority of planned improvement works which consisted of 100 platforms across 43 Stations in the Sussex, Kent and London area, installing in excess of 16,500m of tactile.

Find out more

The Network Rail Welsh Independent Feeder from Newport to Cardiff was successfully designed and Installed by Enable Infrastructure and Enable Powers Systems.

BCM Construction collaboratively with BCM Power Systems successfully designed (GRIP 5 Detailed Design), installed, terminated, and tested the new 15km, 25KV High Voltage Independent feeder 8501.

Find out more

London to Corby (L2C) Electrification Scheme Complete

BCM Construction along with the BCM Power Systems team delivered both Cable Route and Cable installation works whilst delivering the scope for our client SPL Powerlines.

Find out more

Enable Infrastructure Complete Civils Element of £18m Flood Defence Scheme

BCM have completed their section of works for Jacksons which is part of £18m the Flood Defence Scheme contracted by the Environment Agency.

Find out more

Lyminster Bypass Scheme Phase 1 Complete

Watch 9 months’ worth of work in 3 minutes as part of BCM Construction’s involvement on the Lyminster Bypass Scheme!

Find out more

Enable Infrastructure Begin Crown Commercial Service Framework for the NHS

BCM Construction Ltd can announce the award of the design, installation and commission package of works at Milton Keynes University Hospital for the NHS. This award has come through the Crown Commercial Service (CCS)

Find out more

Enable Infrastructure Liverpool Street Christmas Blockade

The team has successfully delivered the crucial enabling works to track, OLE, and signalling between platforms 15 and 18 in preparation for the ultimate extension of Platform 16 and 17 to be undertaken at Easter.

Find out more

Enable Infrastructure appointed as ‘Buildings Fabric Specialist’ part of the Southern Building and Civils (SBC) Framework for Network Rail

BCM appointed as ‘Buildings Fabric Specialist’ part of the Southern Building and Civils (SBC) Framework for Network Rail

Find out more

Enable Infrastructure Christmas Video

Watch our site teams from across the country wish you all a Very Merry Christmas ?

Find out more

Liverpool Street Station Platform Extension GRIP 5-8 Design & Build

The key project deliverable is to complete the platform extensions and associated works by 31st May 2021 to ensure our client can fully introduce and operate their new rolling stock.

Find out more

Western Power Distribution Under-Track Crossing Installation at Weston Super Mare

Our Enable consortium join forces to execute an Under-Track Crossing (UTX) installation for Western Power Distribution (WPD).

Find out more