Renewables
RENEWABLES
Enable Infrastructure (formerly known as BCM Construction) are increasingly engaged in the dynamic renewables sector.
We are proud to be at the forefront of the fast-expanding Electric Vehicle (EV) charging market. We are heavily involved in the complex task of installing forecourt EV charging points alongside existing infrastructure in a national network of petrol stations. As a NICEIC-approved company, Enable Power Systems can certify the works prior to connection to the DNO network.
The Enable Group is a ‘Team of Teams’, and the strength in depth our Power Systems team bring gives Enable Infrastructure and the whole Enable Group a competitive advantage when supporting clients in the development of new infrastructure solutions such as solar farms, battery storage, and transport hubs.
Projects
-
Kettering Station Platform Extensions
Enable Infrastructure (formerly BCM Construction) were contracted by Amey Rail to extend the platform lengths at Kettering Station to serve new 240m trains following the introduction of a new timetable. The works were part of a scheme…
Find out more -
Feltham Re-Signalling Programme – Phase 1 & 2 Civils
Enable Infrastructure (formerly BCM Construction) were appointed Principal Contractor for the design and construction of the full civil engineering scope of works for the Feltham Re-signalling Programme Phase 2 and residual Phase 1….
Find out more -
Hither Green Blockade
The 2020 Hither Green blockade project comprised a series of works at nine stations, including the cleaning, repair and decorating of station canopies.
Enable Infrastructure (formerly BCM Construction) were commissioned to carry out these works following the completion of a two-year programme…
Find out more