Enable Infrastructure working to improve Network Rail Track Access Points
BCM Construction has been working with Network Rail on multiple projects to renew or improve Road Rail Access Points (RRAPS), Safe Walking Routes and Track Worker Safety Sites.
Find out moreThe Network Rail Welsh Independent Feeder from Newport to Cardiff was successfully designed and Installed by Enable Infrastructure and Enable Powers Systems.
BCM Construction collaboratively with BCM Power Systems successfully designed (GRIP 5 Detailed Design), installed, terminated, and tested the new 15km, 25KV High Voltage Independent feeder 8501.
Find out moreLondon to Corby (L2C) Electrification Scheme Complete
BCM Construction along with the BCM Power Systems team delivered both Cable Route and Cable installation works whilst delivering the scope for our client SPL Powerlines.
Find out more