Public Sector
Capability Spotlight: Delivering Complex Geotechnical Solutions at Dollis Hill
The Dollis Hill Retaining Wall project stands as a definitive case study in Enable Infrastructure’s ability to execute complex geotechnical…
Find out moreDollis Hill Replacement Retaining Wall
Delivered for London Underground, this project involved replacing a failing retaining wall adjacent to the live Metropolitan and Jubilee lines. Enable Infrastructure utilised a King Post Wall solution to stabilise the cutting slope, overcoming hazardous ground conditions and severe logistical constraints to deliver the scheme safely and on programme.
Find out moreUKAEA CULHAM CAMPUS RING MAIN
Enable Infrastructure delivered a vital utility upgrade at UKAEA’s Culham Campus to support future expansion of its fusion energy research facilities. The project involved the design and installation of high-voltage power, water, and data infrastructure across a 2km route, with careful planning to preserve environmental and heritage assets. Through sustainable construction practices and collaboration with local suppliers, Enable helped future-proof this national centre of innovation while supporting UKAEA’s carbon zero goals.
Find out moreEmpowering Progress at Hollycross ATFS – Stage 2
Enable Power Systems, in collaboration with Network Rail Testing and WJP Services, successfully completed stage 2 commissioning of the Hollycross auto transformer feeder site, energising critical 25kV infrastructure and confirming compliance with safety and performance standards.
Find out moreMIDLANDS MAIN LINE UPGRADE
Enable Infrastructure completed the Midland Main Line Upgrade for SPL Powerlines UK, a major rail infrastructure project. Key contributions included electrification and overhead line installation across over 100 miles of track. Challenges involved coordination, geographic scope, and design changes. Enable addressed these through logistics planning, multidisciplinary collaboration, and design solutions that improved delivery. The project culminated in enabling a new 400kV-to-25kV supply point substation.
Find out moreExploring Enable – Who are we?
Our CEO, Shane O’Halloran, discusses who and what Enable is and why we decided to create a new brand for a new chapter….
Find out moreICP CONNECTION UNDER-TRACK INSTALLATION AT WESTON-SUPER-MARE
Enable Infrastructure installed two under-track crossings (UTX) for Western Power Distribution in Weston-super-Mare, connecting substations at Warne Road and Bourneville Road. The project involved excavation, reinforced concrete works, and the installation of a 610mm sleeve auger using a guided auger-boring technique. Key deliverables included two UTX installations, reinforced concrete works, duct installations, resurfacing, and the reinstatement of a play park and football pitch.
Find out moreTHAMESDOWN DRIVE RESURFACING
Enable Infrastructure resurfaced 20,000 sq m of Thamesdown Drive, Swindon, upgrading road surfaces, kerbing, and traffic signal cabling across 11 junctions. The project required careful traffic management to minimize disruption in a busy residential and commercial area. Challenges included night work, noise, and relocating bee nests. Key deliverables included resurfacing, road markings, and junction upgrades.
Find out moreEV CHARGING DESIGN AND BUILD FOR BP STATION FORECOURTS
Enable Infrastructure’s work on BP forecourts helped expand EV charging access across the UK while keeping stations operational. By ensuring continuous public access and completing 35 installations in six months, Enable enhanced local infrastructure with new lighting, safety bollards, and EV chargers. Their collaboration with contractors and efficient supply chain management also contributed to making sustainable transport more accessible to the community.