Construction
Capability Spotlight: Delivering Complex Geotechnical Solutions at Dollis Hill
The Dollis Hill Retaining Wall project stands as a definitive case study in Enable Infrastructure’s ability to execute complex geotechnical…
Find out moreDollis Hill Replacement Retaining Wall
Delivered for London Underground, this project involved replacing a failing retaining wall adjacent to the live Metropolitan and Jubilee lines. Enable Infrastructure utilised a King Post Wall solution to stabilise the cutting slope, overcoming hazardous ground conditions and severe logistical constraints to deliver the scheme safely and on programme.
Find out moreSoho Depot – Phase II
Enable Infrastructure completed Phase 2 of the Soho EMU Depot upgrade for West Midlands Trains, following successful delivery of Phase 1. Works included demolition of eight concrete walkways, installation of GRP replacements, deep drainage systems, CET plantroom, and modernised lighting. Despite complex site constraints, Enable delivered safely, on time, and under budget—saving £1.3 million through value engineering.
Find out moreMTR Rail for London Framework
Enable delivered infrastructure upgrades for TfL across London Underground, Overground, DLR, and Crossrail. Projects included structural safety works, embankment stabilisation, and improved public access. Collaborating with MTR, Enable overcame complex design and operational challenges to deliver safe, efficient, and sustainable engineering solutions..
Find out moreSOHO DEPOT PROJECT
Enable Infrastructure upgraded the Soho Depot in Birmingham for West Midlands Trains to maintain new Class 730 trains. The project involved civil, electrical, mechanical, and signaling upgrades to accommodate the new fleet. As program integrator, Enable managed stakeholders and oversaw the project’s diverse scope. Enable’s solutions included detailed stakeholder consultations, phased work packages, and collaborative 3D modeling to minimise disruptions and meet timelines.
Find out moreIMPROVING SECURITY AND ACCESS AT COMPANIES HOUSE
Enable Infrastructure completed the Gatehouse Project to enhance security and access at the Companies House facility in Cardiff. Working through the Crown Commercial Services Framework, they installed robust barriers, security fencing, turnstiles, and vehicle gates to control entry and exit. The project also included new foundations, surfacing, CCTV, lighting, and signage to improve traffic flow and security. Enable overcame challenges like working in a high-security, pedestrianized area by meticulous planning and collaboration.
Find out moreMIDLANDS MAIN LINE UPGRADE
Enable Infrastructure completed the Midland Main Line Upgrade for SPL Powerlines UK, a major rail infrastructure project. Key contributions included electrification and overhead line installation across over 100 miles of track. Challenges involved coordination, geographic scope, and design changes. Enable addressed these through logistics planning, multidisciplinary collaboration, and design solutions that improved delivery. The project culminated in enabling a new 400kV-to-25kV supply point substation.
Find out moreExploring Enable – Who are we?
Our CEO, Shane O’Halloran, discusses who and what Enable is and why we decided to create a new brand for a new chapter….
Find out moreHINKLEY POINT C – CIVILS AND ELECTRICALS WORKS
Enable Infrastructure provided critical civil and electrical expertise to support the Hinkley Point C project. They delivered skilled resources and specialized services, including project management, civil engineering assistance, and construction of substation bases, chambers, cable duct work, and cable installations. Their capabilities helped reduce the client’s contract administration workload for this complex national infrastructure initiative.
Find out moreICP CONNECTION UNDER-TRACK INSTALLATION AT WESTON-SUPER-MARE
Enable Infrastructure installed two under-track crossings (UTX) for Western Power Distribution in Weston-super-Mare, connecting substations at Warne Road and Bourneville Road. The project involved excavation, reinforced concrete works, and the installation of a 610mm sleeve auger using a guided auger-boring technique. Key deliverables included two UTX installations, reinforced concrete works, duct installations, resurfacing, and the reinstatement of a play park and football pitch.
Find out moreIt’s Green Careers Week!
It’s Green Careers Week! A time to promote the many careers that are integral to changing our world for the…
Find out moreTHAMESDOWN DRIVE RESURFACING
Enable Infrastructure resurfaced 20,000 sq m of Thamesdown Drive, Swindon, upgrading road surfaces, kerbing, and traffic signal cabling across 11 junctions. The project required careful traffic management to minimize disruption in a busy residential and commercial area. Challenges included night work, noise, and relocating bee nests. Key deliverables included resurfacing, road markings, and junction upgrades.
Find out more