Uncategorised

Enable Infrastructure are playing a key role in the renovation of Gidea Park Station in preparation for the start of Elizabeth Line services.

MTR Elizabeth line is the operator of the Crossrail concession and is currently running TfL Rail services between Liverpool Street…

Find out more

London to Corby (L2C) Electrification Scheme Complete

BCM Construction along with the BCM Power Systems team delivered both Cable Route and Cable installation works whilst delivering the scope for our client SPL Powerlines.

Find out more

Enable Infrastructure Complete Civils Element of £18m Flood Defence Scheme

BCM have completed their section of works for Jacksons which is part of £18m the Flood Defence Scheme contracted by the Environment Agency.

Find out more

Lyminster Bypass Scheme Phase 1 Complete

Watch 9 months’ worth of work in 3 minutes as part of BCM Construction’s involvement on the Lyminster Bypass Scheme!

Find out more

Enable Infrastructure Begin Crown Commercial Service Framework for the NHS

BCM Construction Ltd can announce the award of the design, installation and commission package of works at Milton Keynes University Hospital for the NHS. This award has come through the Crown Commercial Service (CCS)

Find out more

Coventry Station Renovation Programme for the 2022 Commonwealth Games

BCM were awarded this contract by Network Rail along with Coventry County Council to assist in the construction of a new substation which is required to power the new shopping centre, 2 new sets of lifts and a new car park. The whole station renovation is in preparation for the return of the Commonwealth games to the UK as part of the Coventry Station Master Plan.    

Find out more

Enable Infrastructure Liverpool Street Christmas Blockade

The team has successfully delivered the crucial enabling works to track, OLE, and signalling between platforms 15 and 18 in preparation for the ultimate extension of Platform 16 and 17 to be undertaken at Easter.

Find out more

Enable Infrastructure appointed as ‘Buildings Fabric Specialist’ part of the Southern Building and Civils (SBC) Framework for Network Rail

BCM appointed as ‘Buildings Fabric Specialist’ part of the Southern Building and Civils (SBC) Framework for Network Rail

Find out more

Enable Infrastructure Christmas Video

Watch our site teams from across the country wish you all a Very Merry Christmas ?

Find out more

Enable Infrastructure Welcomes New Senior Commercial Manager – Malcolm Blaxall

Malcolm’s career in the construction industry began as a chain boy in 1981 working for Balfour Beatty on Europe’s largest earth fill dam and progressed on to a long term position training as a Quantity Surveyor on numerous road projects throughout England.

Find out more

Start of Project HSQE Briefing

At the start of any project BCM will deliver a programme of inductions and briefings identifying key health, safety and environmental risks of the project and what is expected of our employees and any of our supply chain who are representing the company and the work we do.

Find out more

Liverpool Street Station Platform Extension GRIP 5-8 Design & Build

The key project deliverable is to complete the platform extensions and associated works by 31st May 2021 to ensure our client can fully introduce and operate their new rolling stock.

Find out more